Westwynd Gardens

The Westwynd Gardens facility will boast a main banquet hall, a charming conservatory, and a purposeful storage building. As a unique touch, a historic building on-site will find new life, adding character and additional storage space to the facility.


Ground breaking ceremony and clearing beginning (12/21/23)

Wismer Tree Managment completing clearing at the Westwynd Gardens project
Caterpillar D4 stripping topsoil at the Westwynd Gardens project

Bulk grading begins, basin key-way being dug (01/02/24)

Caterpillar 336 and 730 working on grading the Westwynd Gardens site
Caterpillar heavy equipment working on the Westwynd Gardens project for Hankin Group
Caterpillar heavy equipment working on the Westwynd Gardens Event Center project

Bulk earthwork continues (01/31/24)

Caterpillar excavator and dump truck work on moving topsoil at the Westwynd Gardens project
Caterpillar D4 dozer places topoil along the basin berm at the Westwynd Gardens project

Aerial views of the progress to date (02/01/24)

Aerial image of the Westwynd Gardens project
Aerial image of the Westwynd Gardens project

Basin outlet pipe beginning to be installed as bulk grading continues (02/12/24)

Caterpillar 336 hammering on rock during pipe installation at the Westwynd Gardens site
Caterpillar D8R Dozer pushing soil at the Westwynd Gardens site
Caterpillar 953 track loader spreadling lime to help stabilize soil at the Westwynd Gardens project

Pond liner tie-in trench being dug, as more topsoil is being stripped. (02/26/24)

John Deere Mini Excavator digging a tie in trench for a pond liner
Caterpillar D6 Dozer pushing topsoil
Caterpillar D8R Dozer pushing up topsoil

Aerial view of the progress made. (02/27/24)

Aerial veiw of the progress made at the Westwynd Gardens project.
Aerial veiw of the progress made at the Westwynd Gardens project.

Earthwork continues as a nice sunrise lights the site. (03/12/24)

CAT 349 laoding rocks into a haul truck at the Westwynd Gardens project.
Caterpillar CS11 roller compacting soil at the Westwynd Gardens project.
Caterpillar D8R Dozer pushing soil and filling a pad at the Westwynd Garden project.